Determination of Control Measures Needed and Evaluation of Their Risks, Benefits, and Effectiveness

The Contractor will be responsible for evaluating and determining control measures. Upon observation or report of a problem, he/she may consider the following:

  1. Extent of the problem;
  2. Available treatments, both natural and chemical;
  3. Previous treatment efforts;
  4. Costs of treatment;
  5. Time involved in treatment;
  6. Risks to residents, structures, and grounds.

Based upon this analysis, he/she may proceed with treatment or advise the Executive Director that extensive treatment may be needed.